| Availability: | |
|---|---|
| Quantity: | |
The foam line body includes:
main clamper drive system(6 stations operation),
3 layers of rubber roller conveyors each 4 sections,(4*3=12 stations),
2 transition shuttles at both end side,
2 elevators at inlet and outlet of curing room
18 jigs( how many jigs is based on the customer’s productivity, )
3 sets of locking/unloading device,
3 sets of opening/closing arms,
2 Door Gantry manipulators, one for Door unloading, the other for new metal panel loading.
1 automatic pouring carrier(double pouring head)
1 mold change station,
1 heating room,
1 set of ventilation system,
1 set of high pressure foaming machine platform etc(not include wet part).
1 set of hydraulic/Pneumatic/Electric control system
Technical Specifications
Stations | 22 |
Foaming jig | L*B 2500mm*1700mm |
Closing height | 220+20mm |
Foaming material | POL/C5+ISO |
Pre - heating temperature | 35℃--55℃ adjustable |
Curing time | 4min—15min(adjustable) |
Curing temperature | 35℃--55℃ adjustable |
Pouring style | double injector,separately with X/Y/Z axis |
Closing time | ≤15s |
Cycle time | 40S |